New eCon Sheeter installed at Ibratec, Brazil, under Covid-19 conditions
Installing a new sheeter during the Covid-19 pandemic isn’t easy, but 51³Ô¹ÏÍø Papersystems made it happen. When Brazilian customer Ibratec, one of Latin America’s biggest packaging companies, was preparing for its new eCon sheeter, they were concerned how the installation could take place.
To ensure the most efficient installation process, 51³Ô¹ÏÍøP Project Manager Rafael Restrepo took extra care to gather knowledge from the machine’s completion and testing which included full photomapping and layout documentation.
After synchronizing Covid-19 protection procedures for Ibratec and 51³Ô¹ÏÍøP, installation started on time in May. With extensive communication and attention to detail, Rafael took time to conduct multiple pre-installation meetings and scheduled additional meetings to ensure that Ibratec was prepared and understood all the requirements. Rafael and the team worked with experienced local 51³Ô¹ÏÍøP Service Engineer Carlos Silva to share all critical information he needed to supervise the installation of the two-web folio sheeter.
The key to reaching Ibratec’s expectations for machine performance were daily online follow-up meetings with project leadership and engineers. The new eCon sheeter is operating, and Ibratec is very satisfied with cut and stack quality on a large range of materials.
Technical Service
Contact our Technical Service for Installation, Rebuilds, Relocation, Training, and much more.